Utility infrastructure
installation and maintenance
For services & information
Call: 0191 414 3399Delivering Safe, Reliable Water Infrastructure for a New Glasgow Business Park
RJ Utility Services Ltd was appointed to deliver a full new water infrastructure system at a business park development just outside Glasgow. The project involved the fabrication, installation, and testing of a complex PE pipe network — supporting both potable water and fire safety requirements.
The contract was secured via a competitive tender, where RJ Utility Services was selected as the most cost-effective and technically qualified bidder.
Scope of Works
-
Fabrication, welding, and installation of over 3km of PE pipework
-
Mains Cold Water and Fire Hydrant system up to 355mm in diameter
-
Installation of associated valves, fire hydrants and smaller services to buildings and water features
-
Full pressure testing, swabbing, chlorination, sampling and flushing
-
Delivery under CDM regulations, in coordination with the principal contractor
-
Site-specific training to meet Scottish Water standards (vs. the usual Northumbrian Water requirements)
Outcomes
-
Delivered 200 person-days ahead of programme
-
All installation and testing completed to Scottish Water specification
-
Project delivered safely and collaboratively, with minimal disruption to other site activities
-
Compliance with all CDM responsibilities and construction phase requirements
-
Successfully upskilled site teams to meet alternate water authority requirements
Challenges & Solutions
-
Restricted Working Conditions
Installing large-diameter pipework within tight, active areas of the site meant operating around other trades, moving plant, and limited space. We developed detailed risk assessments and safe work methods to ensure smooth coordination and safe delivery.
-
Inconsistent Site Access
With breaks of up to a month between working phases, additional hygiene and integrity controls were implemented to maintain system quality throughout the downtime.
-
Switch in Water Authority Standards
Operating to Scottish Water’s specifications (rather than our usual Northumbrian Water standards) required tailored training and pre-mobilisation prep for the team — all delivered ahead of schedule to ensure compliance.
Make enquiry
Case Studies
OSA 2.0 Contract
RJ Utilities Services are the exclusive delivery partner for Openreach’s OSA 2.0 contract across the North East. From fibre rollouts to rural repairs, our teams complete 250+ jobs a month — keeping the region connected with zero compromise on quality.Read More
Eurocentral Business Park
Efficient delivery ahead of schedule — despite tight spaces and tricky access. Discover how RJ Utility Services installed 3km of large-diameter water mains in a bustling new development near Glasgow, overcoming spatial constraints and strict testing standards.Read More
Northern Gas
Networks
22 years strong — and still pushing boundaries. As one of just four core contractors for NGN, we deliver a wide range of civil engineering works, from pipeline builds to riverbank stabilisation. Take a look at what long-term excellence looks like in action.Read More